Wednesday, January 4, 2012

The Garage Floor Slab is poured in January 2012


So here are two pictures of the gridwork of the rebar for the 4" slab garage floor!
Notice how it is level with the road!  It is supposedly several inches higher than the road!

Notice the caulking or sealing of the seams of the planks!

This picture is to show how the rebar from the walls below are bent up and over to become 
part of the 4" slab, intertwined with the grid of rebar.

Ready for the pour of the cement!

Pouring the outside perimeter first and then the floor of the slab

Several men working on this last big pour!
Wa La, instant cement garage floor slab with Lonnie's shadow taking the picture!

Shot taken from the opposite side of the house.  So grateful for mild winter weather!