First, they dug a big hole and leveled it


Then the footings were re barred and poured
Then the forms were put up for the walls and poured the walls

Taking the forms off


We now have a cement box!
Then they tar emulsed it to water proof


After putting in a radon pipe they brought in dirt to make the floor 
John walking the basement walls 
after putting on the base of the floor joists 

So the basement floor is poured

Putting on the floor joists or ceiling joists for the basement

Another angle of the basement!

Plastic over the subflooring to protect from elements
Notice some back filling has taken place