First, they dug a big hole and leveled it
Then the footings were re barred and poured
Then the forms were put up for the walls and poured the walls
Taking the forms off
We now have a cement box!
Then they tar emulsed it to water proof
After putting in a radon pipe they brought in dirt to make the floor
John walking the basement walls
after putting on the base of the floor joists
So the basement floor is poured
Putting on the floor joists or ceiling joists for the basement
Another angle of the basement!
Plastic over the subflooring to protect from elements
Notice some back filling has taken place