Monday, August 8, 2011

Putting the Trusses on half of the House




The Truck arrives with the trusses!

He lays them on the ground before cabling them on over to the top of the house

 They lift them up on the top!

Another angle as they get slowly put up!

It's starting to look like a house!

You can see the crane line lifting them over in this picture!

Wednesday, August 3, 2011

Filling and Compacting the dirt behind the Great Cement WAll

So this was a big hole to fill in and lots of dirt was moved for about 3 days!

The 2nd floor will continue over onto this area for the rec room!

Thanks for heavy equipmen that gets the job done!

Monday, August 1, 2011

The Framing Goes forth through the month of July!

Framing up the Cement Wall from the Lake Side  July 6th 2011

July 6th Getting ready to put floor joists across 2nd floor


Walking that I beam-what dexterity

July 13th Great Fireplace Wall

Huge Footing for Retaining Wall

July 13th Raining but still working on Master Bedroom

Lake Side View of 2nd Floor Master Bedroom July 13th

July 20th Window Wall being reconstructed with steel

July 26th Window Wall completed!  YEAH!