Monday, August 8, 2011
Putting the Trusses on half of the House
The Truck arrives with the trusses!
He lays them on the ground before cabling them on over to the top of the house
They lift them up on the top!
Another angle as they get slowly put up!
It's starting to look like a house!
You can see the crane line lifting them over in this picture!
Wednesday, August 3, 2011
Filling and Compacting the dirt behind the Great Cement WAll
So this was a big hole to fill in and lots of dirt was moved for about 3 days!
The 2nd floor will continue over onto this area for the rec room!
Thanks for heavy equipmen that gets the job done!
Tuesday, August 2, 2011
Asphalt Emulation for Water proofing that Great Cement Wall!
That black tar emulsion having been applied
Monday, August 1, 2011
The Framing Goes forth through the month of July!
Framing up the Cement Wall from the Lake Side July 6th 2011
July 6th Getting ready to put floor joists across 2nd floor
Walking that I beam-what dexterity
July 13th Great Fireplace Wall
Huge Footing for Retaining Wall
July 13th Raining but still working on Master Bedroom
Lake Side View of 2nd Floor Master Bedroom July 13th
July 20th Window Wall being reconstructed with steel
July 26th Window Wall completed! YEAH!